City of Princeton - EST and PWB Backup Power
This project includes the relocation of an existing generator at the Dogwood Pump Station to the Public Works Building: 45 LF - Concrete vertical curb installations and associated utility/structural appurtenances; 1 EA - Relocation of the existing backup generator facility from the Pump Station; 104 SY - Concrete pavement construction and site prep.