Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of 23% Fluorosilicic Acid for the treatment of potable water to aid in dental health for Austin Water (AW).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 29, 2025
Close: Jan 15, 2026
Provide hydrofluorosilicic acid.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The sale of scrap lead acid batteries.
Posted Date
Feb 26, 2024
Due Date
Mar 4, 2027
Release: Feb 26, 2024
Close: Mar 4, 2027
The sale of scrap lead acid batteries.
AvailableThis Sources Sought solicits Architect-Engineering (A-E) design services to modernize the Acid Tank Area at the Radford Army Ammunition Plant (RFAAP) to support upgraded Nitric Acid Concentrator/Sulfuric Acid Concentrator (NAC/SAC) and Modernized Nitrocellulose (MNC) production. The design must handle multiple acids (pyro acid, Strong Sulfuric Acid, Oleum, Strong Nitric Acid), include an Advanced (90%) Design with required tanks and supporting infrastructure, and address all environmental and safety issues. Where feasible, the design should incorporate reuse/retrofit of legacy structures, demolition of obsolete equipment, and a phased modernize-in-place approach.
Posted Date
Dec 12, 2025
Due Date
Jan 9, 2026
Release: Dec 12, 2025
Close: Jan 9, 2026
This Sources Sought solicits Architect-Engineering (A-E) design services to modernize the Acid Tank Area at the Radford Army Ammunition Plant (RFAAP) to support upgraded Nitric Acid Concentrator/Sulfuric Acid Concentrator (NAC/SAC) and Modernized Nitrocellulose (MNC) production. The design must handle multiple acids (pyro acid, Strong Sulfuric Acid, Oleum, Strong Nitric Acid), include an Advanced (90%) Design with required tanks and supporting infrastructure, and address all environmental and safety issues. Where feasible, the design should incorporate reuse/retrofit of legacy structures, demolition of obsolete equipment, and a phased modernize-in-place approach.
Generate five lipid nanoparticle encapsulated self-amplifying nucleic acid based on the genetic components of the Alphavirus Venezuelan equine encephalitis virus (VEEV).
Posted Date
Dec 16, 2025
Due Date
Jan 12, 2026
Release: Dec 16, 2025
Close: Jan 12, 2026
Generate five lipid nanoparticle encapsulated self-amplifying nucleic acid based on the genetic components of the Alphavirus Venezuelan equine encephalitis virus (VEEV).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →