Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Group A - West 3rd Street Outfall repair work includes mobilization 1 LS; bonding and insurance 1 LS; clearing and grubbing 1 LS; site grading 1 LS; riprap, custom mix 105 tons; granular bedding 27 tons; topsoil in place 113 CY; seeding, fertilizer and mulch 0.14 acre; group B 8th Avenue Outfall repair: mobilization 1 LS; bonding and insurance 1 LS; debris removal 1 LS; seeding, fertilizer and mulch 0.04 acre; group C - 7th Avenue Outfall Repair mobilization 1 LS; bonding and insurance 1 LS; site grading 1 LS; rock riprap, custom mix 51 tons; granular bedding 13 tons; topsoil in place 32 cy; seeding, fertilizer and mulch 0.04 acre; group D - 6th Avenue Outfall repair: mobilization 1 LS. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Outfall Repairs.
Posted Date
Jan 5, 2026
Due Date
Feb 12, 2026
Release: Jan 5, 2026
Close: Feb 12, 2026
Outfall Repairs.
AvailableRemedial reconstruction of sanitary sewers, combined sewer and storm drains and emergency repairs.
Posted Date
-
Due Date
Jun 27, 2027
Close: Jun 27, 2027
Remedial reconstruction of sanitary sewers, combined sewer and storm drains and emergency repairs.
AvailableThis work generally consists of excavation of a sinkhole, removal and replacement of an existing drainage manhole, removal and replacement of associated storm sewer piping, backfill with Controlled Low-Strength Material (CLSM), asphalt pavement restoration, sidewalk restoration, and traffic control as needed.
Posted Date
Jan 2, 2026
Due Date
Jan 29, 2026
Release: Jan 2, 2026
Close: Jan 29, 2026
This work generally consists of excavation of a sinkhole, removal and replacement of an existing drainage manhole, removal and replacement of associated storm sewer piping, backfill with Controlled Low-Strength Material (CLSM), asphalt pavement restoration, sidewalk restoration, and traffic control as needed.
AvailableProvide mortimer work center storm damage repairs.
Posted Date
Jun 2, 2025
Due Date
Jul 1, 2026
Release: Jun 2, 2025
Close: Jul 1, 2026
Provide mortimer work center storm damage repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis