Closing soonFL- Community Shelter Phase 2 (Bldg Construction) RFP
Description: Renovation of the existing gymnasium, as outlined in the drawings and specifications, includes exterior improvements to the existing cmu and brick masonry walls, new fenestration, and a new roofing system. Interior improvements include new floor, wall, and ceiling finishes along with gymnasium equipment, retractable seating, and associated building systems and infrastructure. B. New construction as outlined in the drawings and specifications consists of an adjoining building addition utilizing primarily load-bearing cmu wall construction, with structural steel framing at the high-roof portion and low-slope roof assemblies throughout. Exterior construction includes brick masonry veneer, metal wall panels, storefront and curtain wall systems, and associated building envelope components. Interior spaces include a main lobby and central circulation corridor, multipurpose spaces, concessions, restrooms, and other supporting spaces, along with associated interior finishes, fixtures, equipment, and building systems and infrastructure. Site improvements include modifications to existing site circulation and parking areas, new sidewalks and pedestrian connections, grading and drainage improvements, site utilities, and landscaping. 2. Sitework and demolition including: a. Selective demolition of specific existing gymnasium building components, along with the removal of existing site pavement, sidewalks, and other components as indicated on the demolition drawings. 3. Owner furnished furniture, furnishings and equipment (ff&e): a. Contractor's base bid shall include rough-ins for plumbing, mechanical, and electrical: including installation and final connection of all items indicated on the drawings as owner furnished contractor installed (ofci).