CityCA
Aug 27, 2026
Closes
Sep 23, 2026
Zone 3 and 4 Pump Station Upgrades and Hillsborough Pump Station Electrical Upgrades RFP
Project consists of pump station upgrades and pump station electrical upgrades.
Description: Atlantic City is soliciting bids for the Fisherman's Park Pump Station Upgrades EDA Project, and the City's Purchasing page directs vendors to BidNet for bid notices and submissions. The public detail lists publication on 08/26/2026 and closing on 09/24/2026 at 10:00 AM EDT, while the detailed description and bid documents are restricted to registered members. The corresponding Atlantic City record classifies the work as a formal IFB with electronic, lump-sum bid submission, confirming that this is a procurement for project work rather than a grant-program application.
City · NJ, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityCA
Aug 27, 2026
Closes
Sep 23, 2026
Project consists of pump station upgrades and pump station electrical upgrades.
Pittston Township Sewer Authority
Special DistrictPA
Aug 19, 2026
Closes
Sep 9, 2026
The Sewer Authority of the Township of Pittston is soliciting bids for fixed-fee upgrades to Pump Station No. 1. The work includes removing and replacing 5 HP duplex submersible pumps, guide rails, brackets, an emergency generator, and an automatic transfer switch, along with related work. The opportunity opened August 19, 2026, at 10:00 AM EDT and closes September 9, 2026, at 11:00 AM EDT; it is an IFB for construction services, not a grant program.
CityCA
Aug 27, 2026
Closes
Sep 24, 2026
The work generally consists of approx. of removing the existing mobile generator receptacle, constructing generator concrete pad, installing generator and appurtenances including automatic transfer switch, associated conduits and wiring and modifications to the existing main service switchboard and motor control center as necessary for the new generator.
Brookfield Water Pollution Control Authority
Special DistrictCT
Jul 29, 2026
Closes
Sep 11, 2026
The 777 Pump Station Improvement Project involves installing a turnkey packaged pump station with a valve pit and associated appurtenances. The work includes removing the existing wet well, valve pit, propane tank, and generator; providing dewatering and a temporary sewer bypass; installing a diesel generator; and retrofitting an existing manhole inlet with a grinder. The solicitation seeks construction expertise covering pump-station installation, sewer bypass, and related electrical and mechanical systems.
Decision makers connected to this RFP from City of Atlantic City.