Retrieving RFP details
Release
Close
Town of Boscawen
Construct two 22’x58’ additions to the existing fire station. Foundation: 4’ frost walls with 8” concrete slab. The additions will have 2”x6” wood frame walls with 10’8” ceiling height. New bearing walls (posts and beams) will be attached to the existing building (north and south walls) to support new roof trusses. The additions will have 22’ span mono pitch trusses, 3/12 pitch, framed to connect to the existing roof pitch. Interior will be finished with 5/8” sheetrock. Exterior siding and trim to match existing addition. Roofing: Metal or PVC. Roofing should include the entire main roof. Sprinkler system per NFPA Requirements.
County of Maui
Sitework includes both onsite and offsite work. Offsite work includes main waterline connection and installation work. Installation of underground and aboveground utilities (water, sewer, electrical, etc. ); including a detention basin and leach field, water tank, driveways and parking areas, trash enclosure, diesel fuel tank, fuel dispenser; site lighting, landscaping, and transformer pad. Building construction includes a new fire station and apparatus bay and a new apparatus bay addition.
City of Natchitoches
New fire station for the city.
City of Anderson
Provide building design and construction administration services for the construction of a new fire station. The project, as currently defined, is to construct a one- or two-story building housing three bays, administrative offices, and living quarters.
Release
Oct 21, 2025
Close
Dec 10, 2025