FINAL DESIGN, CONSTRUCTION AND COMMISSIONING OF THE NORTHERN RAIL MAINTENANCE-OF-WAY FACILITY
NJ TRANSIT is soliciting electronic proposals for the Final Design, Construction and Commissioning of the Northern Rail Maintenance-of-Way (MOW) Facility, a design-build infrastructure project located in Clifton, New Jersey (Owner Reference No. 0000226). The project will replace the aging and flood-prone Wood-Ridge facility with a modernized base of operations, including demolition and environmental abatement of existing structures at 99 Kuller Road, construction of three new buildings across two NJ TRANSIT-owned sites, site grading, new access roads and parking areas, and coordination of site utilities and maintenance equipment integration. This solicitation is the second phase of a two-phase procurement that followed the 2025 Special Prequalification RFQ; a pre-bid conference on 11/12/2026 at 11:00 a.m. is strongly recommended, electronic proposals are due March 4, 2027 at 11:00 a.m., and bonds are required.