Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Brazosport Water Authority
Filter media replacement and filter rehabilitation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Huntsville Utilities
Work includes the removal, disposal, inspection, and replacement of filter media within existing gravity/pressure filter units.
Posted Date
Nov 5, 2025
Due Date
Dec 11, 2025
Release: Nov 5, 2025
Huntsville Utilities
Close: Dec 11, 2025
Work includes the removal, disposal, inspection, and replacement of filter media within existing gravity/pressure filter units.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Oklahoma City
Filter rehabilitation draper water treatment plant. Rehabilitation of filter nos. 6, 7, 8, and 16. Demolition/removal and off-site disposal of existing filter media, underdrain systems, troughs, and select instrumentation. Selective demolition of air piping and associated supports. Procurement, installation, testing, disinfection, and commissioning of new underdrain system, filter media, media retention caps, and selected trough bid alternate. Concrete repairs. Air piping repairs. Filter instrumentation - all 18 filters. Backwash flow and pressure control improvements.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
City of Oklahoma City
Close: Dec 17, 2025
Filter rehabilitation draper water treatment plant. Rehabilitation of filter nos. 6, 7, 8, and 16. Demolition/removal and off-site disposal of existing filter media, underdrain systems, troughs, and select instrumentation. Selective demolition of air piping and associated supports. Procurement, installation, testing, disinfection, and commissioning of new underdrain system, filter media, media retention caps, and selected trough bid alternate. Concrete repairs. Air piping repairs. Filter instrumentation - all 18 filters. Backwash flow and pressure control improvements.
AvailableTown of Danvers
Removing, stockpiling and disposing of 70 CYof sand filter media from sand filter 1 & 2, chemical cleaning of the existing water treatment plant sand filter beds suing pantonite pm77
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
Town of Danvers
Close: Dec 4, 2025
Removing, stockpiling and disposing of 70 CYof sand filter media from sand filter 1 & 2, chemical cleaning of the existing water treatment plant sand filter beds suing pantonite pm77
AvailableCity of Somerton
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
City of Somerton
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →