Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include install filtered bottle-filling station. Is connected to customer site piping. Filters water and is certified to meet nsf/ansi standard 53 for lead reduction and nsf/ansi standard 42 for particulate removal. The flow rate through the station is paired to the specified flow rate of the filter cartridge. Has a light or other device to indicate filter cartridge replacement status. Is designed to fill drinking bottles or other containers for personal water consumption. Includes a drinking fountain. The station is certified to meet nsf/ansi standard 61 q<=1.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Countertop and plumbing fixture replacement.
Posted Date
Jan 5, 2026
Due Date
Jan 23, 2026
Release: Jan 5, 2026
Close: Jan 23, 2026
Countertop and plumbing fixture replacement.
AvailableProvide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
Posted Date
Nov 26, 2025
Due Date
Feb 5, 2026
Release: Nov 26, 2025
Close: Feb 5, 2026
Provide construction management at risk (cmar) services to assist rwrd to enter into construction contracts to build the water system improvement program consisting of a surface water intake, tunnel, raw water pump station, raw water transmission pipeline, water treatment plant, and potable water transmission.
AvailableWork consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableWater distribution system operation and information management to assess and evaluate all the fire hydrants and valves in the Village water distribution system.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Water distribution system operation and information management to assess and evaluate all the fire hydrants and valves in the Village water distribution system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis