Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeks for field training.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construct a B-21 Field Training Detachment Building. Construction includes drilled pier concrete foundation, steel frame structure, metal roof, exterior insulating finish system, painting & surface prep. Special foundation due to local soils. Utilities include domestic water, electrical, sanitary sewer, gas & communication systems. Site improvements include earthwork landscaping & exterior lighting. Pavements include parking, sidewalks & access roadways. Facility construction will include multiple compartmented secure areas meeting Air Force Global Strike Command security requirements. Facilities to be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of Defense Minimum Antiterrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Premium
Access the largest public sector contact database
Close: Dec 16, 2025
Construct a B-21 Field Training Detachment Building. Construction includes drilled pier concrete foundation, steel frame structure, metal roof, exterior insulating finish system, painting & surface prep. Special foundation due to local soils. Utilities include domestic water, electrical, sanitary sewer, gas & communication systems. Site improvements include earthwork landscaping & exterior lighting. Pavements include parking, sidewalks & access roadways. Facility construction will include multiple compartmented secure areas meeting Air Force Global Strike Command security requirements. Facilities to be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of Defense Minimum Antiterrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems.
AvailableWork consists of the installation of a septic field for Building Q – Emergency Services Training Center (ESTC) on the existing campus.
Posted Date
Oct 27, 2025
Due Date
Dec 17, 2025
Release: Oct 27, 2025
Close: Dec 17, 2025
Work consists of the installation of a septic field for Building Q – Emergency Services Training Center (ESTC) on the existing campus.
AvailableField renovation.
Posted Date
Nov 30, 2025
Due Date
Jan 6, 2026
Release: Nov 30, 2025
Close: Jan 6, 2026
Field renovation.
AvailableStadium field renovations.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
Stadium field renovations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis