Open RFP

Fiber to the Premises (FTTP) Network Upgrade within a designated node, Phase 4 RFP

Description: The Project includes all labor, material, and equipment to complete and install a fully functioning Fiber Network and associated installation of the following: 1.Signal transmission lateral fiber optic cable(s) from SELCO’s existing Backbone fiber ring to each of the identified splitter cabinets. 2.Signal distribution lateral fiber optic cable(s) from the identified splitter cabinets to the predetermined fiber access point public right of way locations as indicated on the design drawings. 3.Fiber optic cable splicing along with pre, and post installation testing of all fiber installed throughout the network. 4.SELCO will provide some of the required materials for the Project, a list of which can be found listed in the exhibits to this Bid’s documents.

Buyer
Released
Sep 11, 2026
Closes
Sep 29, 2026(16 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts