Alamo Area Council of Governments
Special DistrictTX
Jul 21, 2026
Closes
Aug 19, 2026
RFP-26-02-JBSA-Fiber Optic Cabling Installation Services-Lackland (149th Fighter Wing) (Request for Proposal)
Provide fiber optic cabling installation services.
Description: Fiber optic cabling and accessories - Multimode 50um OM4 24F Rose 1000' Indoor Plenum, Multimode 50um OM4 24F Red 1000' Indoor Plenum, Multimode 50um OM4 24F Violet 1000' Indoor Plenum, Fiber Zone Box 4 RU. See attached files
Federal · MT, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Alamo Area Council of Governments
Special DistrictTX
Jul 21, 2026
Closes
Aug 19, 2026
Provide fiber optic cabling installation services.
CountyGA
Jul 31, 2026
Closes
Sep 2, 2026
The Burke County Board of Commissioners is seeking a contractor to provide underground fiber optic drop installation services connecting existing fiber distribution infrastructure to residential and commercial premises. Required work includes burying drop fiber, installing riser guards and Fiber Optic Termination Boxes, maintaining sequential records, documenting materials, and submitting equipment and pricing information. The solicitation is an open services procurement, not a grant program, with proposals due September 2, 2026, at 12:00 PM Eastern Time.
Navajo Tribal Utility Authority
Special DistrictAZ
-
Closes
Aug 28, 2026
Procurement of fiber materials, specifically 96-count fiber optical cable loose tube, for warehouse stock replenishment inventory.
Lakewood Township Municipal Utilities Authority
Special DistrictNJ
Aug 6, 2026
Closes
Aug 18, 2026
Installation of fiber optic cabling at the Well Field as follows: 48-strand single mode fiber from head end to first manhole; splice in manhole, then distribute (4) 12-strand single mode fiber runs — one to each well location; 1 FIS large outdoor splice case; 48 fusion splices; 2U CCH for SCADA head end; 4 WM boxes; 8 12-port LC couplers; 50 LC pigtails; 10 x 2-meter single mode fiber optic patch cords (included in scope); LTMUA to open manholes as needed.
Procurement and program contacts connected to Great Plains Regional Office.