Closing soon

Fiber Installation RFP

Description: A 48-strand OS2 single-mode fiber will be installed between Studio A Main Distribution Frame (MDF) and Studio A Intermediate Distribution Frame (IDF), which serves the studio equipment. Panduit enclosures and bulkheads are preferred for this installation, with LC/LC termination specified. Of the 48 strands, 24 will be terminated for immediate use, while the remaining strands will be reserved as spares to accommodate future expansion needs.

Buyer
Released
Aug 5, 2026
Closes
Aug 13, 2026(4 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts