Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project shall consist of the installation of site preparation for a new 16' wide by 32' long bait stand facility including but not limited to: new concrete foundation and approach slabs, wood framed hurricane and flood resistant construction, building electrical, mini-split for office space, installation of a 3/4" saltwater supply line, and all necessary products for a complete building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Victims of crime act (VOCA) victim assistance grant program is to provide direct services and assistance to victims of crime.
Posted Date
Jan 12, 2026
Due Date
Mar 23, 2026
Release: Jan 12, 2026
Close: Mar 23, 2026
Victims of crime act (VOCA) victim assistance grant program is to provide direct services and assistance to victims of crime.
AvailableProject consists of restoration and mitigation of power supply and plantwide systems. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions.
Posted Date
Dec 24, 2025
Due Date
Feb 25, 2026
Release: Dec 24, 2025
Close: Feb 25, 2026
Project consists of restoration and mitigation of power supply and plantwide systems. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions.
AvailableThe work involves replacement of the existing main with approx. 1200 LF of new water piping, including replacement of existing service laterals and installation of new fire hydrants. See attached files.
Posted Date
Jan 6, 2026
Due Date
Mar 5, 2026
Release: Jan 6, 2026
Close: Mar 5, 2026
The work involves replacement of the existing main with approx. 1200 LF of new water piping, including replacement of existing service laterals and installation of new fire hydrants. See attached files.
Available2026 curb and sidewalk program project.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
2026 curb and sidewalk program project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis