Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the replacement of existing Federal Pacific load centers and panel boards. The scope of work includes relocating existing feeders and branch circuit wiring to new load center and panel board locations. Additionally, the work encompasses limited asbestos abatement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Conduct switchgear testing. General service and testing includes cleaning, adjustment, inspection, lubrication, minor repairs and electrical testing as applicable.
Posted Date
Oct 24, 2025
Due Date
Dec 24, 2025
Release: Oct 24, 2025
Close: Dec 24, 2025
Conduct switchgear testing. General service and testing includes cleaning, adjustment, inspection, lubrication, minor repairs and electrical testing as applicable.
AvailablePremium
Access the largest public sector contact database
Service 480V switchgear replacement.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Service 480V switchgear replacement.
AvailableThe Ohio Department of Mental Health and Addiction Services is soliciting a contractor to supply and install replacement batteries for the generator switchgear at a facility in Massillon, Ohio. The scope includes removal and disposal of existing batteries, installation of thirty-seven (37) 1.3V batteries to restore a 48V bank, testing/commissioning, and provision of warranty and disposal documentation. The period of performance runs from December 8, 2025 to December 22, 2025, and the response deadline is December 22, 2025.
Posted Date
Dec 8, 2025
Due Date
Dec 22, 2025
Release: Dec 8, 2025
Close: Dec 22, 2025
The Ohio Department of Mental Health and Addiction Services is soliciting a contractor to supply and install replacement batteries for the generator switchgear at a facility in Massillon, Ohio. The scope includes removal and disposal of existing batteries, installation of thirty-seven (37) 1.3V batteries to restore a 48V bank, testing/commissioning, and provision of warranty and disposal documentation. The period of performance runs from December 8, 2025 to December 22, 2025, and the response deadline is December 22, 2025.
AvailableProject scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.