Summary
Missouri is soliciting bids for Federal Aid Project No. BRO-R049(002), CR160 Over Tributary to Buck Branch, a bridge replacement construction project located in Missouri. The scope of work includes removal and replacement of an existing 25-foot-long multi-span steel girder bridge with a new double cell 10-foot span by 5-foot tall reinforced concrete box culvert, including embankment, riprap, excavation, roadway improvements, and asphalt paving. Sealed bids are due by 1:30 PM on August 13, 2026; this project is part of the federal-aid Off-System Bridge Replacement (BRO) program administered through the Missouri Department of Transportation.