Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : construction of approx 1.23 mile long concrete pavement boulevard with illuminated roundabout intersection and pedestrian tunnels, storm sewer, water line, wastewater line, and bridge.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include develop a two-way roadway with a multi-use path. Also require the construction of a bridge to cross Clarks Creek. The bridge will be approx 123' CL to CL of end bents (120' clear span). The construction of the bridge spanning Clarks Creek will require relocation of the stream channel approx 120' to the east. The proposed new channel will be straightened through the bridge opening. There will be some modifications to school parking lots to work with the new roadway alignment and infrastructure. Storm sewer infrastructure will be added for drainage and the existing storm sewer will be modified as necessary. The intersection connection to Quaker Blvd will require turn lane modifications and signal modifications. Lighting will be added and modified along the corridor. Miscellaneous related work includes, but is not limited to: clearing, tree removal, maintenance of traffic, erosion control, pavement markings, signage, lighting, signal modifications, tree plantings, landscaping, curb ramps, sidewalks, and other work
Posted Date
Dec 29, 2025
Due Date
Jan 26, 2026
Release: Dec 29, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 26, 2026
Work include develop a two-way roadway with a multi-use path. Also require the construction of a bridge to cross Clarks Creek. The bridge will be approx 123' CL to CL of end bents (120' clear span). The construction of the bridge spanning Clarks Creek will require relocation of the stream channel approx 120' to the east. The proposed new channel will be straightened through the bridge opening. There will be some modifications to school parking lots to work with the new roadway alignment and infrastructure. Storm sewer infrastructure will be added for drainage and the existing storm sewer will be modified as necessary. The intersection connection to Quaker Blvd will require turn lane modifications and signal modifications. Lighting will be added and modified along the corridor. Miscellaneous related work includes, but is not limited to: clearing, tree removal, maintenance of traffic, erosion control, pavement markings, signage, lighting, signal modifications, tree plantings, landscaping, curb ramps, sidewalks, and other work
Release: Oct 23, 2025
Close: Feb 3, 2026
Parkway phase 1 - construction project.
AvailableThe project consists of paving, drainage, and utility improvements for Bluejack Ranch Phase 2A in Parker County, Texas. Bids are being accepted by Aledo Ranch Development Co LLC on behalf of Cresson Crossroads Municipal Utility District #2, with contracts awarded separately for utility and paving work. A non‑mandatory pre‑bid is scheduled for February 5, 2026, and bids are due on February 12, 2026 at 10:00 AM CST.
Posted Date
-
Due Date
Feb 12, 2026
Release: -
Close: Feb 12, 2026
The project consists of paving, drainage, and utility improvements for Bluejack Ranch Phase 2A in Parker County, Texas. Bids are being accepted by Aledo Ranch Development Co LLC on behalf of Cresson Crossroads Municipal Utility District #2, with contracts awarded separately for utility and paving work. A non‑mandatory pre‑bid is scheduled for February 5, 2026, and bids are due on February 12, 2026 at 10:00 AM CST.
AvailableProject includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Project includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.