Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Farmington
The work consists of renovations of the public restroom, loading dock, addressing bird infiltration, new HVAC systems, and miscellaneous construction improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lakewood
City of Lakewood requires pre-qualification of bidders for the Weingart Senior Center Renovation project. Contractors must complete a pre-qualification questionnaire and provide financial statements to be eligible to bid.
Posted Date
Nov 10, 2025
Due Date
Dec 8, 2025
Release: Nov 10, 2025
City of Lakewood
Close: Dec 8, 2025
City of Lakewood requires pre-qualification of bidders for the Weingart Senior Center Renovation project. Contractors must complete a pre-qualification questionnaire and provide financial statements to be eligible to bid.
AvailableCity of Nappanee
Work includes comprehensive interior and exterior renovations to the senior center includes accessibility upgrades: ADA-compliant restroom renovations and first-floor leveling. Interior renovations: new flooring, wall treatments, lighting, and ceiling systems, including demolition and reconfiguration as required. Kitchen improvements: modernization of the existing kitchen into a commercial-grade facility with updated utilities, appliances, and finishes. Exterior masonry work: repointing, rebuilding, unit replacement, and lintel repair to improve long-term structural integrity.
Posted Date
Sep 9, 2025
Due Date
Dec 8, 2025
Release: Sep 9, 2025
City of Nappanee
Close: Dec 8, 2025
Work includes comprehensive interior and exterior renovations to the senior center includes accessibility upgrades: ADA-compliant restroom renovations and first-floor leveling. Interior renovations: new flooring, wall treatments, lighting, and ceiling systems, including demolition and reconfiguration as required. Kitchen improvements: modernization of the existing kitchen into a commercial-grade facility with updated utilities, appliances, and finishes. Exterior masonry work: repointing, rebuilding, unit replacement, and lintel repair to improve long-term structural integrity.
AvailableCity of Wyoming
Work includes renovate the southeast men's and women's restroom; american standard toilets (no substitutions will be accepted); elongated bowls; number of toilets installed should match what is currently there; including one ADA toilet including ADA compliant handrails; number of urinals installed should match what is currently there. ; ceramic tile and base; must be compatible with current floor drains; replace existing drain covers with new floor drain covers that have matching finishes; pricing can be given for one or all of the following types of partitions: phenolic, solid plastic (HDPE), plastic laminate. See attached file.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
City of Wyoming
Close: Dec 2, 2025
Work includes renovate the southeast men's and women's restroom; american standard toilets (no substitutions will be accepted); elongated bowls; number of toilets installed should match what is currently there; including one ADA toilet including ADA compliant handrails; number of urinals installed should match what is currently there. ; ceramic tile and base; must be compatible with current floor drains; replace existing drain covers with new floor drain covers that have matching finishes; pricing can be given for one or all of the following types of partitions: phenolic, solid plastic (HDPE), plastic laminate. See attached file.
AvailableMetropolitan State University
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
Posted Date
Oct 28, 2025
Due Date
Nov 25, 2025
Release: Oct 28, 2025
Metropolitan State University
Close: Nov 25, 2025
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis