Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation and replacement of storm drainage piping (hdpe and related structures); installation of culverts beneath; construction of concrete headwalls, junction boxes, and drop inlets; reconfiguration and rehabilitation of roadside ditches and grass swales; construction of a stormwater wetland / scm with outlet structures riprap aprons and energy dissipation; asphalt sawcutting and patching; erosion and sediment control measures; restoration, seeding, mulching, and stabilization of disturbed areas; protection of existing utilities, fences, and infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project generally consists of restoring the functionality of the Diversion Dam by repairing and reinforcing its structure to ensure stability. Additionally, a notch will be added to the dam to facilitate fish passage. The project also includes placing riprap and rocks downstream of the dam, as well as bank revegetation efforts.
Posted Date
Jan 12, 2026
Due Date
Feb 2, 2026
Release: Jan 12, 2026
Close: Feb 2, 2026
Project generally consists of restoring the functionality of the Diversion Dam by repairing and reinforcing its structure to ensure stability. Additionally, a notch will be added to the dam to facilitate fish passage. The project also includes placing riprap and rocks downstream of the dam, as well as bank revegetation efforts.
AvailableProcurement of services for the Creston Annex Head Start Stormwater Project, involving stormwater facility installation, permeable paver replacement, and native landscaping with outdoor play elements.
Posted Date
Jan 16, 2026
Due Date
Mar 13, 2026
Release: Jan 16, 2026
Close: Mar 13, 2026
Procurement of services for the Creston Annex Head Start Stormwater Project, involving stormwater facility installation, permeable paver replacement, and native landscaping with outdoor play elements.
AvailableStormwater and multi-use pathway project.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Stormwater and multi-use pathway project.
AvailableThe City of Kalispell invites sealed bids for construction of a stormwater decant facility, including a four‑bay cast‑in‑place concrete structure, earthwork, site grading, storm piping and manholes, stormwater treatment equipment, and a new 100‑amp electrical service. An additive alternate includes a partially enclosed pre‑engineered metal building. Bids are accepted electronically via QuestCDN, with a pre‑bid meeting on February 11, 2026, and bids due February 19, 2026 at 1:00 PM local time.
Posted Date
Jan 18, 2026
Due Date
Feb 19, 2026
Release: Jan 18, 2026
Close: Feb 19, 2026
The City of Kalispell invites sealed bids for construction of a stormwater decant facility, including a four‑bay cast‑in‑place concrete structure, earthwork, site grading, storm piping and manholes, stormwater treatment equipment, and a new 100‑amp electrical service. An additive alternate includes a partially enclosed pre‑engineered metal building. Bids are accepted electronically via QuestCDN, with a pre‑bid meeting on February 11, 2026, and bids due February 19, 2026 at 1:00 PM local time.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis