Summary
Work includes 1 LS of mobilization; 4 EA of move mailbox; 4 EA of reconstruct valve box - lower; 4 EA of reconstruct valve box - raise; 1 EA of reconstruct manhole - raise; 3,299 CY of roadway excavation; 2,221 cy of untreated base course; 75 CY of asphalt pavement soft spot repair - contingency item; 5,747 TN of hmhma - 1/2"; 29 TN of emulsified asphalt (tack); 1,320 SY of rotomilling - depth varies; 26,118 SY of broadcast seed (plan quantity); 26,118 SY of hecp type 1 (plan quantity); 405 GAL of pavement marking paint; 79 SF of sign type a-1; 4 EA of remove sign less than 20 SF; 1 EA of remove sign post; etc, see attached file.