Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Wheat Ridge requests proposals to repaint the exterior stucco portions and roof-mounted screen walls of the Wheat Ridge Recreation Center (approximately 70,000 sq ft). The work includes surface preparation, priming, application of two coats of commercial-grade exterior paint, mock-up approval, warranties, and coordination with facility operations and cellular providers. Proposals are due December 11, 2025 at 3:00 PM Mountain Time; questions are due November 21, 2025 by 3:00 PM and a non-mandatory pre-proposal meeting is scheduled for November 14, 2025 at 9:00 AM.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Repainting the interior and exterior metal surfaces of a 3,000,000-gallon water storage standpipe including surface preparation, collection and disposal of surface preparation debris, and painting; installation of mixing system and other miscellaneous items of work.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Repainting the interior and exterior metal surfaces of a 3,000,000-gallon water storage standpipe including surface preparation, collection and disposal of surface preparation debris, and painting; installation of mixing system and other miscellaneous items of work.
AvailableWork includes seal and paint the entire exterior of the sports center building, as well as complete storefront aesthetics improvements such as retaining walls and building signage.
Posted Date
Dec 26, 2025
Due Date
Feb 5, 2026
Release: Dec 26, 2025
Close: Feb 5, 2026
Work includes seal and paint the entire exterior of the sports center building, as well as complete storefront aesthetics improvements such as retaining walls and building signage.
AvailableFurnishing of labor, material and equipment entering into the construction of longleaf neuro-medical treatment center exterior sewer upgrades.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Furnishing of labor, material and equipment entering into the construction of longleaf neuro-medical treatment center exterior sewer upgrades.
AvailableConsists of improvements to the interior and exterior of the Lebanon Readiness Center. Interior renovations include the replacement of wall finishes, floor coverings, damaged ceiling tiles, replacement of lighting fixtures with LED lights, and door hardware. Selective demolition of the existing restrooms will be required for the revised restroom layouts to include individual shower stalls. Include improvements to the existing mechanical, plumbing, and electrical systems. Improvements to the exterior include light demolition to restore the exterior dumpster enclosure, replacement of the LED wall packs, and fluid-applied roofing over the existing standing seam metal roof.
Posted Date
-
Due Date
Feb 10, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Consists of improvements to the interior and exterior of the Lebanon Readiness Center. Interior renovations include the replacement of wall finishes, floor coverings, damaged ceiling tiles, replacement of lighting fixtures with LED lights, and door hardware. Selective demolition of the existing restrooms will be required for the revised restroom layouts to include individual shower stalls. Include improvements to the existing mechanical, plumbing, and electrical systems. Improvements to the exterior include light demolition to restore the exterior dumpster enclosure, replacement of the LED wall packs, and fluid-applied roofing over the existing standing seam metal roof.