Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of parking lot and roadway light pole assemblies, luminaires, and concrete foundations; providing new parking lot and roadway light pole assemblies, luminaires, and concrete foundations; new exterior luminaires at buildings; underground lighting ductlines and conductors; interior electrical distribution systems including panelboards and branch circuits; and miscellaneous related and incidental work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pavement repairs, campuswide, phase 1.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Pavement repairs, campuswide, phase 1.
AvailableProvide Interior and Exterior Upgrades of New Mings Apartments.
Posted Date
Jan 29, 2026
Due Date
Feb 19, 2026
Release: Jan 29, 2026
Close: Feb 19, 2026
Provide Interior and Exterior Upgrades of New Mings Apartments.
AvailableProvide and install an LED lighting project on the exterior of a skywalk.
Posted Date
Nov 19, 2025
Due Date
Jan 26, 2026
Release: Nov 19, 2025
Close: Jan 26, 2026
Provide and install an LED lighting project on the exterior of a skywalk.
The project at the New Market Skills Center includes upgrades to the interior finishes and replacement of doors, windows, and operable wall system within the Alexander Room in Building A. Exterior wall lights will be replaced with equivalent LED's at Buildings A, B, and C as well as the Boiler and Maintenance Buildings. Within Building C, the existing paint booth for the Collision Repair Shop will be replaced and a paint mixing room will also be added. Ductwork, gas supply, electrical, and fire sprinkler revisions are included. The new paint booth and paint mixing room are pre-manufactured and assembled on site. Alternate bid #1 - install two layers of 5/8 GWB sound baffle to structure on either side of the operable wall track in the Alexander Room.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project at the New Market Skills Center includes upgrades to the interior finishes and replacement of doors, windows, and operable wall system within the Alexander Room in Building A. Exterior wall lights will be replaced with equivalent LED's at Buildings A, B, and C as well as the Boiler and Maintenance Buildings. Within Building C, the existing paint booth for the Collision Repair Shop will be replaced and a paint mixing room will also be added. Ductwork, gas supply, electrical, and fire sprinkler revisions are included. The new paint booth and paint mixing room are pre-manufactured and assembled on site. Alternate bid #1 - install two layers of 5/8 GWB sound baffle to structure on either side of the operable wall track in the Alexander Room.