Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sturgeon
Work includes install approx. 4900 LF of 8" wastewater irrigation line, including approx. 210 LF to be bored and jacked at a railroad crossing, connection to the existing piping system and existing center irrigation pivot, and necessary modifications to the existing pivot.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Manhattan Beach
Work includes irrigation central control installation. Provide active watering of the irrigation system at all times during the irrigation project, label all existing irrigation wires in the existing controller with current station number, record existing irrigation controller programming for later use, removal and disposal of existing irrigation controller and existing irrigation equipment, clean and seal/waterproof existing controller enclosures, furnish and install new smart irrigation controller assembly into existing controller enclosure, ground controller, wire new smart irrigation controller assembly to existing electrical in existing controller enclosure. Electrical wires and connections to be in flexible conduit and junction boxes.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
City of Manhattan Beach
Close: Dec 16, 2025
Work includes irrigation central control installation. Provide active watering of the irrigation system at all times during the irrigation project, label all existing irrigation wires in the existing controller with current station number, record existing irrigation controller programming for later use, removal and disposal of existing irrigation controller and existing irrigation equipment, clean and seal/waterproof existing controller enclosures, furnish and install new smart irrigation controller assembly into existing controller enclosure, ground controller, wire new smart irrigation controller assembly to existing electrical in existing controller enclosure. Electrical wires and connections to be in flexible conduit and junction boxes.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Manhattan Beach
Work includes irrigation central control installation. Provide active watering of the irrigation system at all times during the irrigation project, label all existing irrigation wires in the existing controller with current station number, record existing irrigation controller programming for later use, removal and disposal of existing irrigation controller and existing irrigation equipment, clean and seal/waterproof existing controller enclosures, furnish and install new smart irrigation controller assembly into existing controller enclosure, ground controller, wire new smart irrigation controller assembly to existing electrical in existing controller enclosure. Electrical wires and connections to be in flexible conduit and junction boxes.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
City of Manhattan Beach
Close: Dec 16, 2025
Work includes irrigation central control installation. Provide active watering of the irrigation system at all times during the irrigation project, label all existing irrigation wires in the existing controller with current station number, record existing irrigation controller programming for later use, removal and disposal of existing irrigation controller and existing irrigation equipment, clean and seal/waterproof existing controller enclosures, furnish and install new smart irrigation controller assembly into existing controller enclosure, ground controller, wire new smart irrigation controller assembly to existing electrical in existing controller enclosure. Electrical wires and connections to be in flexible conduit and junction boxes.
AvailableCity of Carrollton
Provide the city with irrigation installations and repairs.
Posted Date
Dec 8, 2025
Due Date
Dec 23, 2025
Release: Dec 8, 2025
City of Carrollton
Close: Dec 23, 2025
Provide the city with irrigation installations and repairs.
AvailableKnight Museum and Sandhills Center
Irrigation Pump Station Installation.
Posted Date
Nov 26, 2025
Due Date
Dec 11, 2025
Release: Nov 26, 2025
Knight Museum and Sandhills Center
Close: Dec 11, 2025
Irrigation Pump Station Installation.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →