Posted
Sep 3, 2026
Sep 25, 2026
Wasilla-Fishhook Road - Main Street Rehabilitation RFP
Includes new road construction, lane reconfigurations, signals, utilities, lighting, drainage, pavement, signing, striping, sidewalk, and landscaping.
Description: The Town of Grand Falls-Windsor invites qualified contractors to submit a lump-sum tender for rehabilitation of the main swimming pool at the Exploits Valley YMCA. The work includes commercial reinforced membrane resurfacing, replacement of specified through-wall hydraulic fixtures, concrete and deck restoration, integration of owner-supplied automatic water-level control equipment, testing, commissioning, and closeout. The formal invitation to tender was published on August 6, 2026, remains open, and closes August 20, 2026 at 2:30 p.m. EDT; the stated work period is November 15 through December 19, 2026.
City · NL, CA
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Posted
Sep 3, 2026
Sep 25, 2026
Includes new road construction, lane reconfigurations, signals, utilities, lighting, drainage, pavement, signing, striping, sidewalk, and landscaping.
CityCA
Posted
Aug 28, 2026
Sep 17, 2026
Project consists of pavement rehabilitation.
CityCA
Posted
Sep 2, 2026
Oct 7, 2026
Work includes approx 1,450 LF of force main inspection; 64 LF of 4" DIP pipe; 50 LF of 8" SDR 26 PVC; 18 VF of wetwell coating; 300 SF of concrete F&I; 1,028 SF of asphalt F&I; 1,425 LF of Additional 4” Force Main Replacement.
CityVA
Posted
Jul 30, 2026
Sep 9, 2026
The Town of Woodstock, Virginia is seeking sealed bids to rehabilitate approximately 500 linear feet of existing 6-inch sanitary sewer main through installation of a Cured-in-Place Pipe (CIPP) liner. Bidders must have at least five years of CIPP rehabilitation experience, hold the necessary Virginia licenses, provide required insurance documentation, and submit the specified bid forms. The invitation was posted July 30, 2026, responses are due September 9, 2026, and substantial completion is expected within 45 calendar days after issuance of the Notice to Proceed.
Decision makers connected to this RFP from Grand Falls-Windsor.