OtherNY
Posted
Oct 13, 2026
Nov 3, 2026
Essex County CDBG Wells, Septic & Lateral Program Design-build - Full Residential Well Replacement Projects RFP
DESIGN-BUILD. Professional design, engineering, or PE-stamped plans are not automatically required for every ordinary residential well project. Such professional services or stamped plans shall be provided where required by the authority having jurisdiction, permitting agency, site conditions, proposed system design, or applicable law. Project: 1,Well repair/replacement. Existing well was originally dug in approx. 1950. Contractor to evaluate existing well and determine whether repair, rehabilitation, or complete replacement is appropriate. Bid should provide a complete, functional, code-compliant water supply system. Project 2: Well and related water supply work, Contractor to evaluate existing well and water supply conditions and provide the necessary repair, rehabilitation, or replacement work to establish a reliable residential water supply. Project 3: Well repair/replacement, Contractor to evaluate the existing well and water supply system and provide all necessary work to establish a reliable, functional residential water supply.
