Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Abandon and relocate an existing 6-inch waterline crossing; Tie into the existing 8-inch main on Laurel Street; Extend across the southern boundary of the Murphy Gas Station property; This alignment will eliminate the vertical conflict with the storm drain, allow abandonment of the existing 6-inch line, and maintain service to adjacent properties, including re-supply to an existing fire hydrant. The proposed waterline will be approx. 490 LF in length and installed at a depth of 5 feet or shallower.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Install approx. 650 L of new 8" C900 waterline to replace an existing water main within and to the east of Seventh Avenue. Reconnect and replace existing water services and traffic control.
Posted Date
Dec 2, 2025
Due Date
Dec 16, 2025
Release: Dec 2, 2025
Close: Dec 16, 2025
Install approx. 650 L of new 8" C900 waterline to replace an existing water main within and to the east of Seventh Avenue. Reconnect and replace existing water services and traffic control.
AvailablePremium
Access the largest public sector contact database
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
Posted Date
Nov 15, 2025
Due Date
Dec 17, 2025
Release: Nov 15, 2025
Close: Dec 17, 2025
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
AvailableWork consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
AvailableConstruct a pedestrian plaza on Thomas Street between Fifth Avenue North and Taylor Avenue North including new sidewalk, pavement, channelization, signals, drainage, and landscaping. Work also includes rebar installation and electrical.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Construct a pedestrian plaza on Thomas Street between Fifth Avenue North and Taylor Avenue North including new sidewalk, pavement, channelization, signals, drainage, and landscaping. Work also includes rebar installation and electrical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis