Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Baldwyn
The City of Baldwyn requests proposals from qualified firms to prepare an application for a Wastewater Improvements project and, if awarded, to provide engineering design, bid support, construction administration, and inspection. The scope includes a preliminary engineering report, cost estimates, plans and specifications, bid distribution and tabulation, and construction inspection; potential funding sources referenced include HUD, the Appalachian Regional Commission, and USDA.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Zionsville
The Town of Zionsville seeks proposals for designing, building, and transferring the 2026 Wastewater Improvements Project, which includes upgrades to the wastewater treatment plant and lift stations. The project involves modernizing unit processes, electrical, and SCADA systems, with a maximum budget of $9.6 million. The winning proposer will collaborate with the Town and Project Engineer, Commonwealth Engineers, Inc., to complete the project under a public-private agreement.
Posted Date
Nov 10, 2025
Due Date
Dec 5, 2025
Release: Nov 10, 2025
Town of Zionsville
Close: Dec 5, 2025
The Town of Zionsville seeks proposals for designing, building, and transferring the 2026 Wastewater Improvements Project, which includes upgrades to the wastewater treatment plant and lift stations. The project involves modernizing unit processes, electrical, and SCADA systems, with a maximum budget of $9.6 million. The winning proposer will collaborate with the Town and Project Engineer, Commonwealth Engineers, Inc., to complete the project under a public-private agreement.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Zionsville
The Town of Zionsville seeks proposals for designing, building, and transferring the 2026 Wastewater Improvements Project, which includes upgrades to the wastewater treatment plant and lift stations. The project involves modernizing unit processes, electrical, and SCADA systems, with a maximum budget of $9.6 million. The winning proposer will collaborate with the Town and Project Engineer, Commonwealth Engineers, Inc., to complete the project under a public-private agreement.
Posted Date
Nov 10, 2025
Due Date
Dec 5, 2025
Release: Nov 10, 2025
Town of Zionsville
Close: Dec 5, 2025
The Town of Zionsville seeks proposals for designing, building, and transferring the 2026 Wastewater Improvements Project, which includes upgrades to the wastewater treatment plant and lift stations. The project involves modernizing unit processes, electrical, and SCADA systems, with a maximum budget of $9.6 million. The winning proposer will collaborate with the Town and Project Engineer, Commonwealth Engineers, Inc., to complete the project under a public-private agreement.
AvailableCity of Cooper City
The City of Cooper City, FL is requesting qualifications from engineering firms to provide design, permitting, bidding/award assistance, and post-design services to upgrade or replace the entire electrical system for its water and wastewater treatment, storage, distribution, and collection systems. Proposals must be submitted electronically via the OpenGov portal by December 15, 2025 at 3:00 PM Eastern, with a mandatory pre-proposal conference on November 21, 2025.
Posted Date
Nov 7, 2025
Due Date
Dec 15, 2025
Release: Nov 7, 2025
City of Cooper City
Close: Dec 15, 2025
The City of Cooper City, FL is requesting qualifications from engineering firms to provide design, permitting, bidding/award assistance, and post-design services to upgrade or replace the entire electrical system for its water and wastewater treatment, storage, distribution, and collection systems. Proposals must be submitted electronically via the OpenGov portal by December 15, 2025 at 3:00 PM Eastern, with a mandatory pre-proposal conference on November 21, 2025.
AvailableEast Bay Municipal Utility District
East Bay Municipal Utility District seeks professional engineering consultant services for an Owner Advisor role in the Dewatering Improvements Project at its Main Wastewater Treatment Plant. The project will use a progressive design-build method, requiring expertise in guiding the District through this process, ensuring project completion on schedule and within budget.
Posted Date
Nov 6, 2025
Due Date
Dec 19, 2025
Release: Nov 6, 2025
East Bay Municipal Utility District
Close: Dec 19, 2025
East Bay Municipal Utility District seeks professional engineering consultant services for an Owner Advisor role in the Dewatering Improvements Project at its Main Wastewater Treatment Plant. The project will use a progressive design-build method, requiring expertise in guiding the District through this process, ensuring project completion on schedule and within budget.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →