CityNJ
Jun 29, 2026
Closes
Jul 30, 2026
63rd Street Pumping Station Flood Resiliency Project
Work includes repairs to the pump station building, installation of a new roof, replacements of the existing sanitary piping, installation of a new bypass suction and discharge connection with associated pipework, upgrades to electrical junction boxes at each pump, installation of a new pre-cast concrete vault structure for stormwater discharge into the nearby drainage ditch, installation of a new headwall, replacement of an existing storm sewer pipe from a curb inlet to the new vault, and replacement of chain link fence near the drainage ditch.