Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Wyoming seeks professional engineering design services to plan and administer the demolition of an abandoned water tower at the Wyoming Retirement Center in Basin, Wyoming. The scope includes design development, hazardous materials identification, environmental compliance and permitting, utility termination, preparation of plans and specifications, bidding assistance, and construction administration. Proposals must be submitted through Public Purchase by the stated deadline, with questions due via the portal by February 2, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Wyoming seeks professional engineering design services to replace one boiler and associated MEP systems in the Wyoming Retirement Center boiler plant and to integrate the new boiler with the existing BAS. The project also includes replacement of the existing boiler, indirect water heater, and associated MEP components for the Superintendent House on the campus. Proposals must be submitted through Public Purchase by the stated deadline, using the State’s required forms.
Posted Date
-
Due Date
Feb 19, 2026
Release: -
Close: Feb 19, 2026
The State of Wyoming seeks professional engineering design services to replace one boiler and associated MEP systems in the Wyoming Retirement Center boiler plant and to integrate the new boiler with the existing BAS. The project also includes replacement of the existing boiler, indirect water heater, and associated MEP components for the Superintendent House on the campus. Proposals must be submitted through Public Purchase by the stated deadline, using the State’s required forms.
AvailableSeeking professional Design-Build Services for the Dix Park Buildings Abatement, Demolition and Stabilization Project, including architectural and engineering services, construction, project management, and related services for building stabilization and demolition.
Posted Date
Jan 5, 2026
Due Date
Feb 13, 2026
Release: Jan 5, 2026
Close: Feb 13, 2026
Seeking professional Design-Build Services for the Dix Park Buildings Abatement, Demolition and Stabilization Project, including architectural and engineering services, construction, project management, and related services for building stabilization and demolition.
AvailableThe City of Casper is seeking architectural/engineering design services for a conceptual study and preliminary design for improvements to the Water Distribution Garage Building.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
The City of Casper is seeking architectural/engineering design services for a conceptual study and preliminary design for improvements to the Water Distribution Garage Building.
AvailableRequest for engineering design services for the replacement of the Bethany Reservoir with two new welded steel water tanks, including design, permitting, and construction support.
Posted Date
-
Due Date
Feb 24, 2026
Close: Feb 24, 2026
Request for engineering design services for the replacement of the Bethany Reservoir with two new welded steel water tanks, including design, permitting, and construction support.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →