Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Scotts Valley Water District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Treasurer
General Manager
President
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Scotts Valley Water District
Request for engineering design services for the replacement of the Bethany Reservoir with two new welded steel water tanks, including design, permitting, and construction support.
Posted Date
-
Due Date
Feb 24, 2026
Scotts Valley Water District
Close: Feb 24, 2026
Request for engineering design services for the replacement of the Bethany Reservoir with two new welded steel water tanks, including design, permitting, and construction support.
AvailableScotts Valley Water District
The Project involves removing approx 200-LF of existing 8” ACP and replacing with 200- LF of8” PVC C900, removing and replacing approx 200-LF of curb, gutter and sidewalk and pavement restoration.
Posted Date
Feb 3, 2025
Due Date
Mar 3, 2025
Release: Feb 3, 2025
Scotts Valley Water District
Close: Mar 3, 2025
The Project involves removing approx 200-LF of existing 8” ACP and replacing with 200- LF of8” PVC C900, removing and replacing approx 200-LF of curb, gutter and sidewalk and pavement restoration.
Scotts Valley Water District
Replace existing watermains located within the city. New watermain approx 1,370 lf in length and 300-feet or less of pipe replacement and installation.
Posted Date
Jan 28, 2025
Due Date
Feb 27, 2025
Release: Jan 28, 2025
Scotts Valley Water District
Close: Feb 27, 2025
Replace existing watermains located within the city. New watermain approx 1,370 lf in length and 300-feet or less of pipe replacement and installation.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.