CityMA
Posted
Nov 4, 2026
Dec 17, 2026
Water Pollution Control Facility Secondary Treatment Upgrades and Facility Improvements (Request for Proposal)
Provide water pollution control facility secondary treatment upgrades and facility improvements.
Description: Provide energy efficient facility improvements.
SchoolDistrict · MO, US
Adjacent opportunities open for bidding right now.
CityMA
Posted
Nov 4, 2026
Dec 17, 2026
Provide water pollution control facility secondary treatment upgrades and facility improvements.
CityIL
Posted
Aug 28, 2026
Dec 1, 2026
Provide a professional independence day fireworks display. Looking for secondary quotes on drone shows that could be an alternative to traditional fireworks.
Special DistrictWI
Posted
-
Dec 21, 2026
This program offers incentives for the installation of specific energy-efficient equipment, including Dairy Plate Coolers/Well Water Pre-Coolers, Low/Zero Energy Livestock Waterers, Exhaust Fans, Circulation Fans, Scroll Refrigerator Compressors, and Variable Frequency Drives.
CityOK
Posted
Oct 30, 2026
Dec 3, 2026
Work consist of 6 cy of furnish and place reinforced concrete foundation including 4" of crushed stone leveling sub-base, 1 ea of furnish and install pre-manufactured or built on-site obelisk, 11 ea of furnish and install bent plate anchors including stainless steel expansion bolts, 1 ea of furnish and install electrical conduit and conductors for obelisk lighting, replace and compact excavated earth, 22. 4 sy of furnish and place 4" thick reinforced concrete slab including crushed stone base.
Decision makers connected to this RFP from Tipton R-VI School District.
Solicitation files and supporting documents for this bid.