Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Snohomish County Public Utility District (PUD) is soliciting quotations for EMVT instrument transformers for the Getchell Switching Station (MID 563983). Vendors must obtain bid documents and submit responses through the PublicPurchase e‑procurement portal. The solicitation is an equipment procurement RFQ and is due in mid-January 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The RFQ requests supply of a 115 kV control enclosure (RFQ #25-1618-CS) for the Getchell Switching Station to meet the Snohomish County Public Utility District's standards for 115 kV operations. The solicitation was posted on 2025-12-17 and bids are due 2026-01-21. Proposers should request documents via bids@snopud.com.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
The RFQ requests supply of a 115 kV control enclosure (RFQ #25-1618-CS) for the Getchell Switching Station to meet the Snohomish County Public Utility District's standards for 115 kV operations. The solicitation was posted on 2025-12-17 and bids are due 2026-01-21. Proposers should request documents via bids@snopud.com.
AvailableProvide 56MVA, 13.8/72.49 kV GSU transformer for Olive A3 switching station.
Posted Date
Oct 29, 2025
Due Date
Jan 19, 2026
Release: Oct 29, 2025
Close: Jan 19, 2026
Provide 56MVA, 13.8/72.49 kV GSU transformer for Olive A3 switching station.
AvailableContractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of switching station, stage 01. The principal components of the work involve miscellaneous sitework, demolition, earthwork, chain link fence, gravel surfacing, riprap, and seeding; providing concrete foundations; providing steel structures; installing Government-Furnished equipment including power circuit breakers, disconnecting switches, coupling capactor voltage transformers, surge arrester, voltage transformers, and control cable,; providing station battery sytems, switchboard sections, high voltage bus, grounding, conduit, cable trench, distribution panels, miscellaneous electrical, communication facilities, fiber optic cables and equipment, and constructing a site-built contol builing complete with electrical and mechanical systems.
Posted Date
Dec 22, 2025
Due Date
Feb 7, 2026
Release: Dec 22, 2025
30 EA Texas instruments switching voltage regulators mfr # lm22677tj-adj/nopb or equal.
Posted Date
Jan 6, 2026
Due Date
Jan 9, 2026
Release: Jan 6, 2026
Close: Jan 9, 2026
30 EA Texas instruments switching voltage regulators mfr # lm22677tj-adj/nopb or equal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of switching station, stage 01. The principal components of the work involve miscellaneous sitework, demolition, earthwork, chain link fence, gravel surfacing, riprap, and seeding; providing concrete foundations; providing steel structures; installing Government-Furnished equipment including power circuit breakers, disconnecting switches, coupling capactor voltage transformers, surge arrester, voltage transformers, and control cable,; providing station battery sytems, switchboard sections, high voltage bus, grounding, conduit, cable trench, distribution panels, miscellaneous electrical, communication facilities, fiber optic cables and equipment, and constructing a site-built contol builing complete with electrical and mechanical systems.
Available