Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1,490 30" ductile iron pipe (class 52); 1,310 24" ductile iron pipe (class 52).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project generally consists of the rehabilitation of potable water storage high tank and ground reservoir, painting, steel repairs, reservoir roof replacement, electrical and SCADA modifications; and all other related appurtenances and accessories necessary to complete the Work. See outside link.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
This project generally consists of the rehabilitation of potable water storage high tank and ground reservoir, painting, steel repairs, reservoir roof replacement, electrical and SCADA modifications; and all other related appurtenances and accessories necessary to complete the Work. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 17, 2025
Close: Jan 8, 2026
Watermain Replacement.
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
AvailableEngineering, design, manufacture, testing, preparation for shipment, and delivery of one (1) new Circulating and Reservoir Water Pump Motor and accessories
Posted Date
Oct 24, 2025
Due Date
Jan 15, 2026
Release: Oct 24, 2025
Close: Jan 15, 2026
Engineering, design, manufacture, testing, preparation for shipment, and delivery of one (1) new Circulating and Reservoir Water Pump Motor and accessories
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →