Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide elevator control system upgrades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide elevator upgrades & ceiling reconstruction. Demolition and abatement construction, general construction, mechanical construction and electrical construction for work. Scope of work includes elevator modernization to main elevator at the student/visitors entrance inclusive of interior cab finish upgrades. Interior cab finish upgrades only to a secondary elevator at the science wing. Corridor ceiling spot abatement and repairs. MS Gymnasium flooring replacement and electrical panel upgrades.
Posted Date
Jan 9, 2026
Due Date
Jan 28, 2026
Release: Jan 9, 2026
Close: Jan 28, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide elevator upgrades & ceiling reconstruction. Demolition and abatement construction, general construction, mechanical construction and electrical construction for work. Scope of work includes elevator modernization to main elevator at the student/visitors entrance inclusive of interior cab finish upgrades. Interior cab finish upgrades only to a secondary elevator at the science wing. Corridor ceiling spot abatement and repairs. MS Gymnasium flooring replacement and electrical panel upgrades.
AvailableAll work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
Posted Date
Oct 3, 2025
Due Date
Feb 3, 2026
Release: Oct 3, 2025
Close: Feb 3, 2026
All work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
AvailableThe University of North Carolina (UNC) is soliciting contractors to perform elevator upgrades in the Fretwell Building at UNC Charlotte, including removal of outdated components, installation of new elevator machinery, modernization of control systems, and bringing systems into compliance with current safety standards. A pre-bid/site visit is scheduled for 2026-01-12 and interested bidders are directed to obtain plans/specifications (design firm noted as C Design). The solicitation was posted on 2026-01-08 with bids due on 2026-01-30 and is listed as an open procurement (not a grant).
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
The University of North Carolina (UNC) is soliciting contractors to perform elevator upgrades in the Fretwell Building at UNC Charlotte, including removal of outdated components, installation of new elevator machinery, modernization of control systems, and bringing systems into compliance with current safety standards. A pre-bid/site visit is scheduled for 2026-01-12 and interested bidders are directed to obtain plans/specifications (design firm noted as C Design). The solicitation was posted on 2026-01-08 with bids due on 2026-01-30 and is listed as an open procurement (not a grant).
AvailableThe City is seeking proposals for a comprehensive Parking Access and Revenue Control System replacement and upgrades, including a Point-of-Sale (POS) system for parking lots, hardware/software improvements, and mobile technology enhancements.
Posted Date
Oct 10, 2025
Due Date
Jan 23, 2026
Release: Oct 10, 2025
Close: Jan 23, 2026
The City is seeking proposals for a comprehensive Parking Access and Revenue Control System replacement and upgrades, including a Point-of-Sale (POS) system for parking lots, hardware/software improvements, and mobile technology enhancements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →