Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide elevator upgrades & ceiling reconstruction. Demolition and abatement construction, general construction, mechanical construction and electrical construction for work. Scope of work includes elevator modernization to main elevator at the student/visitors entrance inclusive of interior cab finish upgrades. Interior cab finish upgrades only to a secondary elevator at the science wing. Corridor ceiling spot abatement and repairs. MS Gymnasium flooring replacement and electrical panel upgrades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Elevator upgrades at various schools.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Elevator upgrades at various schools.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes reconstruction to middle school town water connection.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
Work includes reconstruction to middle school town water connection.
AvailableWork includes but is not limited to high school vestibule addition; reconstruction work at high school offices, lobby, gymnasium, fitness center, restrooms, and classrooms; casework, flooring, and restroom reconstruction work at elementary school classrooms.
Posted Date
Jan 7, 2026
Due Date
Feb 2, 2026
Release: Jan 7, 2026
Close: Feb 2, 2026
Work includes but is not limited to high school vestibule addition; reconstruction work at high school offices, lobby, gymnasium, fitness center, restrooms, and classrooms; casework, flooring, and restroom reconstruction work at elementary school classrooms.
AvailableThe University of North Carolina (UNC) is soliciting contractors to perform elevator upgrades in the Fretwell Building at UNC Charlotte, including removal of outdated components, installation of new elevator machinery, modernization of control systems, and bringing systems into compliance with current safety standards. A pre-bid/site visit is scheduled for 2026-01-12 and interested bidders are directed to obtain plans/specifications (design firm noted as C Design). The solicitation was posted on 2026-01-08 with bids due on 2026-01-30 and is listed as an open procurement (not a grant).
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
The University of North Carolina (UNC) is soliciting contractors to perform elevator upgrades in the Fretwell Building at UNC Charlotte, including removal of outdated components, installation of new elevator machinery, modernization of control systems, and bringing systems into compliance with current safety standards. A pre-bid/site visit is scheduled for 2026-01-12 and interested bidders are directed to obtain plans/specifications (design firm noted as C Design). The solicitation was posted on 2026-01-08 with bids due on 2026-01-30 and is listed as an open procurement (not a grant).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →