Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The HPHA is pursuing a project to update and replace the electrical infrastructure at our three high rise properties. These buildings have a total of 357 apartments amongst the three buildings. The contractor will obtain all permits and coordinate all inspections required by local authorized agencies having jurisdiction. The contractor will provide all materials and labor for a complete electrical installation. All electrical materials, devices, appliances, and equipment will be new and bear the Underwriters Laboratories, Inc. (UL) label where available. The above list is not exhaustive, and the specifications manual and drawings included in the solicitation should be studied carefully for a comprehensive scope of work and job requirements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacement of cooling towers number 1 and 2 at the central plant (building 11).
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Replacement of cooling towers number 1 and 2 at the central plant (building 11).
AvailableWork includes repair of water towers.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Work includes repair of water towers.
AvailableThe West Virginia Purchasing Division (on behalf of the Department of Administration, General Services Division) is soliciting bids to remove and replace Cooling Towers 1 and 2 at the Central Plant (Building 11), 218 California Avenue, Charleston, WV; the scope includes demolition, installation of new towers, testing, and all associated work with an expected project duration of 270 days. A mandatory pre-bid meeting is scheduled for 2026-01-13 at 10:00 AM and vendor questions are due by 2026-01-20; bids are due on 2026-02-03 at 1:30 PM ET. This is a construction solicitation (not a grant); an AI-based budget estimate shown on the aggregator was $500,000–$1,500,000.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
The West Virginia Purchasing Division (on behalf of the Department of Administration, General Services Division) is soliciting bids to remove and replace Cooling Towers 1 and 2 at the Central Plant (Building 11), 218 California Avenue, Charleston, WV; the scope includes demolition, installation of new towers, testing, and all associated work with an expected project duration of 270 days. A mandatory pre-bid meeting is scheduled for 2026-01-13 at 10:00 AM and vendor questions are due by 2026-01-20; bids are due on 2026-02-03 at 1:30 PM ET. This is a construction solicitation (not a grant); an AI-based budget estimate shown on the aggregator was $500,000–$1,500,000.
Provide the material, equipment, tools and labor necessary for the rehabilitation of the Towers PRT Station. Remove the existing roof, insulation, and wood deck down to the structural steel; remove loose membrane flashings; remove all debris from the roof and haul away to an approved landfill. Provide and install new 22-Gauge Galvanized B-Deck. Painting of the deck shall not be part of this project. Remove the existing lightning protection system. The installation of a new lightning protection system shall not be part of this project. Provide and install new wood blocking at the roof edge to the height of the new tapered insulation. Frame in the existing windows on the raised roof area with steel framing and plywood sheathing. Insulate the back side of the framed wall to prevent condensation. Flash the new wall with EPDM flashing. Apply a continuous layer of tapered insulation with a minimum thickness of 1.5” at the roof drain over the entire area Apply a 60 mil, fully adhered, EPDM rubber roof system over the new insulation At all walls and curbs, install membrane flashing. Mechanically attach the new flashing continuously along the top edge. Apply manufacturer-approved flashing systems at all pipes, drains, metal drain boxes, and other projections. Provide and install new edge metal fabricated from 24-gauge galvanized steel with Kynar 500 coating. Color shall be selected by owner from manufacturer’s standard color chart.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 20, 2026
Close: Feb 12, 2026
Provide the material, equipment, tools and labor necessary for the rehabilitation of the Towers PRT Station. Remove the existing roof, insulation, and wood deck down to the structural steel; remove loose membrane flashings; remove all debris from the roof and haul away to an approved landfill. Provide and install new 22-Gauge Galvanized B-Deck. Painting of the deck shall not be part of this project. Remove the existing lightning protection system. The installation of a new lightning protection system shall not be part of this project. Provide and install new wood blocking at the roof edge to the height of the new tapered insulation. Frame in the existing windows on the raised roof area with steel framing and plywood sheathing. Insulate the back side of the framed wall to prevent condensation. Flash the new wall with EPDM flashing. Apply a continuous layer of tapered insulation with a minimum thickness of 1.5” at the roof drain over the entire area Apply a 60 mil, fully adhered, EPDM rubber roof system over the new insulation At all walls and curbs, install membrane flashing. Mechanically attach the new flashing continuously along the top edge. Apply manufacturer-approved flashing systems at all pipes, drains, metal drain boxes, and other projections. Provide and install new edge metal fabricated from 24-gauge galvanized steel with Kynar 500 coating. Color shall be selected by owner from manufacturer’s standard color chart.
Available