Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the demolition of existing unit substation, distribution and branch circuit panelboard and associated transformers, four motor control centers, and control panel. Purchasing and installation of new unit substation, distribution panelboards, branch circuit panelboard, motor control center, control panel, neta testing, and a short circuit, overcurrent, and arc flash hazard study on installed equipment
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water purification plant lime transfer system electrical & control improvements.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Water purification plant lime transfer system electrical & control improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves renovation of approx 2,000 SF of existing lab/office/storage spaces on the northern side of the east laboratory building. These spaces will be developed into two new biosafety level (BSL) laboratory spaces. The work to be performed includes construction of suitable architectural finishes, new HVAC system, flooring, laboratory equipment, electrical, mechanical, security and plumbing fixtures for developing BSL2+ and BSL3 laboratory spaces.
Posted Date
Oct 15, 2025
Due Date
Jan 13, 2026
Release: Oct 15, 2025
Close: Jan 13, 2026
Project involves renovation of approx 2,000 SF of existing lab/office/storage spaces on the northern side of the east laboratory building. These spaces will be developed into two new biosafety level (BSL) laboratory spaces. The work to be performed includes construction of suitable architectural finishes, new HVAC system, flooring, laboratory equipment, electrical, mechanical, security and plumbing fixtures for developing BSL2+ and BSL3 laboratory spaces.
AvailableProject consists of improvements to the existing Water Reclamation Facility to expand the existing activated sludge system and implement Enhanced Biological Nutrient Removal system utilizing the A2O process. This project includes construction of new activated sludge tanks, new blowers, splitter structures, a final clarifier conversion, UV equipment, sludge pumping, chemical feed equipment, site work, electrical, control, and mechanical improvements. The project also include equipment replacements including grit removal, primary clarifier mechanisms/weir/baffles, a final clarifier drive, sludge pumps, a sludge storage tank, heat exchangers, gravity belt thickener rehabilitation, and blowers. Project includes demolition of the existing trickling filters, intermediate clarifiers. manholes, and select piping. Project also includes site/civil, mechanical, electrical, and controls improvements. All work is as outlined in the Contract documents.
Posted Date
Jan 7, 2026
Due Date
Feb 18, 2026
Release: Jan 7, 2026
Close: Feb 18, 2026
Project consists of improvements to the existing Water Reclamation Facility to expand the existing activated sludge system and implement Enhanced Biological Nutrient Removal system utilizing the A2O process. This project includes construction of new activated sludge tanks, new blowers, splitter structures, a final clarifier conversion, UV equipment, sludge pumping, chemical feed equipment, site work, electrical, control, and mechanical improvements. The project also include equipment replacements including grit removal, primary clarifier mechanisms/weir/baffles, a final clarifier drive, sludge pumps, a sludge storage tank, heat exchangers, gravity belt thickener rehabilitation, and blowers. Project includes demolition of the existing trickling filters, intermediate clarifiers. manholes, and select piping. Project also includes site/civil, mechanical, electrical, and controls improvements. All work is as outlined in the Contract documents.
AvailableProvide electrical improvements.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Provide electrical improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →