Retrieving RFP details
Release
Close
East Bay Municipal Utility District
Work consists of perform construction of industrial electrical power distribution and control systems at water and wastewater facilities, and the delivery, storage, handling, installation, and testing and commissioning of equipment which include, anchors, fasteners, hangers and supports for the electrical equipment. Low and medium voltage fused and non-fused disconnect switches.
City of Richland
Prequalify for electrical utility work, which may include electrical distribution (2400V - 15,000V), electrical transmission (52,000V - 230,000V), electrical substation (2400V - 230,000V), and secondary electrical systems (0V to 600V).
Franklin County Public Utility District 1
Electrical work: Electrical substation, transmission, and distribution construction; streetlights; dock crew projects; meter testing; pole testing and treatment; and tree trimming around electrical lines. Fiber work: Splicing; and overhead and/or underground fiber construction.
North Carolina Department of Public Safety
Develop and maintain a list of prequalified prime construction contractors and vendors to perform, or cause to be performed: reconstruction, rehabilitation, demolition, and/or elevation/mitigation services.
Release
-
Close
Dec 31, 2026