Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of electric gate repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of installation of an automatic vertical pivot vehicle gate and pedestrian gate. Remove existing rolling gate and properly dispose of it and construct new 20ft wide x 6ft tall vertical pivot gate and personnel gate including 3 strands barbed wire at top of gates with all associated hardware and controls including , electrical, concrete pad for opener, exit loop, battery backup, pedestal with keypad and 50 RFID tags and reader for vehicle entrance.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
Work consists of installation of an automatic vertical pivot vehicle gate and pedestrian gate. Remove existing rolling gate and properly dispose of it and construct new 20ft wide x 6ft tall vertical pivot gate and personnel gate including 3 strands barbed wire at top of gates with all associated hardware and controls including , electrical, concrete pad for opener, exit loop, battery backup, pedestal with keypad and 50 RFID tags and reader for vehicle entrance.
Premium
Access the largest public sector contact database
This solicitation requests comprehensive roof repair services for Rialto Unified School District’s District Office and District Registration Center, including foam removal/repairs, power washing, and recoating with white elastomeric acrylic coating. The work includes contingency pricing for wood rot and provision of required materials and must be completed per the Contract Documents and Master Construction Schedule. The project covers two sites: 182 E. Walnut Ave, Rialto, CA (District Office) and 260 S. Willow Ave, Rialto, CA (District Registration Center).
Posted Date
Dec 8, 2025
Due Date
Dec 22, 2025
Release: Dec 8, 2025
Close: Dec 22, 2025
This solicitation requests comprehensive roof repair services for Rialto Unified School District’s District Office and District Registration Center, including foam removal/repairs, power washing, and recoating with white elastomeric acrylic coating. The work includes contingency pricing for wood rot and provision of required materials and must be completed per the Contract Documents and Master Construction Schedule. The project covers two sites: 182 E. Walnut Ave, Rialto, CA (District Office) and 260 S. Willow Ave, Rialto, CA (District Registration Center).
AvailableReplace approx 1160 LF of existing perimeter security fence at Gibson City Maintenance Yard. Replace manual steel swing gate at Gibson City Maintenance Yard with 30’ Aluminum slide gate. Replace approx 1502 LF of existing perimeter security fence at the Forrest Maintenance Yard. Replace 24’ manual swing gate on main entrance with 30’ Aluminum slide gate and new electric gate opener. Replace 24’ manual swing gate on north side with 24’ Aluminum slide gate.
Posted Date
Sep 24, 2025
Due Date
Jan 6, 2026
Release: Sep 24, 2025
Close: Jan 6, 2026
Replace approx 1160 LF of existing perimeter security fence at Gibson City Maintenance Yard. Replace manual steel swing gate at Gibson City Maintenance Yard with 30’ Aluminum slide gate. Replace approx 1502 LF of existing perimeter security fence at the Forrest Maintenance Yard. Replace 24’ manual swing gate on main entrance with 30’ Aluminum slide gate and new electric gate opener. Replace 24’ manual swing gate on north side with 24’ Aluminum slide gate.
AvailableReplace 11 existing cast iron gates, currently installed in concrete channels, with 316L stainless steel (SS) slide gates. Replace existing gear boxes, actuators, stem protection, and other associated components to meet the technical specifications and robust operational requirements of the new gates. Replace the existing cathodic protection (CP) system with new corrosion protection technology. Remove existing trash rake system, including the conveyor belt and debris pad which are no longer in use. Recoat stoplog guides, wall thimbles, and water level measurement equipment.
Posted Date
Dec 10, 2025
Due Date
Dec 24, 2025
Release: Dec 10, 2025
Close: Dec 24, 2025
Replace 11 existing cast iron gates, currently installed in concrete channels, with 316L stainless steel (SS) slide gates. Replace existing gear boxes, actuators, stem protection, and other associated components to meet the technical specifications and robust operational requirements of the new gates. Replace the existing cathodic protection (CP) system with new corrosion protection technology. Remove existing trash rake system, including the conveyor belt and debris pad which are no longer in use. Recoat stoplog guides, wall thimbles, and water level measurement equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis