Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Illinois Department of Transportation
Replace approx 1160 LF of existing perimeter security fence at Gibson City Maintenance Yard. Replace manual steel swing gate at Gibson City Maintenance Yard with 30’ Aluminum slide gate. Replace approx 1502 LF of existing perimeter security fence at the Forrest Maintenance Yard. Replace 24’ manual swing gate on main entrance with 30’ Aluminum slide gate and new electric gate opener. Replace 24’ manual swing gate on north side with 24’ Aluminum slide gate.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Stillwater Medical Center Authority
Chiller replacement.
Posted Date
Jun 14, 2025
Due Date
Dec 11, 2025
Release: Jun 14, 2025
Stillwater Medical Center Authority
Close: Dec 11, 2025
Chiller replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Little Rock
The U.S. Army Corps of Engineers, Little Rock District issued Solicitation W9127S26RA001 for Intake Gate Replacement - Unit 3 at Table Rock Powerhouse in Taney County, Missouri. The project is estimated between $1,000,000 and $5,000,000, was advertised as a total small business set-aside under NAICS 332312 (Fabricated Structural Metal Manufacturing), and includes an organized site visit and an RFI process on ProjNet. Bidders must access the solicitation on SAM.gov or via the PIEE Solicitation Module (links provided on the HigherGov page); HigherGov indicates the response deadline was updated to Dec 31, 2025 at 2:00 p.m. EST.
Posted Date
Oct 24, 2025
Due Date
Dec 31, 2025
Release: Oct 24, 2025
U.S. Army Engineer District Little Rock
Close: Dec 31, 2025
The U.S. Army Corps of Engineers, Little Rock District issued Solicitation W9127S26RA001 for Intake Gate Replacement - Unit 3 at Table Rock Powerhouse in Taney County, Missouri. The project is estimated between $1,000,000 and $5,000,000, was advertised as a total small business set-aside under NAICS 332312 (Fabricated Structural Metal Manufacturing), and includes an organized site visit and an RFI process on ProjNet. Bidders must access the solicitation on SAM.gov or via the PIEE Solicitation Module (links provided on the HigherGov page); HigherGov indicates the response deadline was updated to Dec 31, 2025 at 2:00 p.m. EST.
AvailableColleton County School District
To purchase and install various types of fencing/gates throughout the district.
Posted Date
Oct 15, 2025
Due Date
Dec 9, 2025
Release: Oct 15, 2025
Colleton County School District
Close: Dec 9, 2025
To purchase and install various types of fencing/gates throughout the district.
AvailableNorth Jersey District Water Supply Commission (NJDWSC)
Furnish and deliver one (1) 48", dingle disk, metal seated, none-rising stem (NRS), gate valve with an 8" bypass gate valve and a corresponding gear box
Posted Date
Aug 5, 2025
Due Date
Feb 3, 2026
Release: Aug 5, 2025
North Jersey District Water Supply Commission (NJDWSC)
Close: Feb 3, 2026
Furnish and deliver one (1) 48", dingle disk, metal seated, none-rising stem (NRS), gate valve with an 8" bypass gate valve and a corresponding gear box
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →