Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Elastomeric Roof Coating System To Restore an Existing Metal Roof.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consist of re-roof of existing metal roof system, replacement of light transmitting panels.
Posted Date
Dec 22, 2025
Due Date
Jan 29, 2026
Release: Dec 22, 2025
Close: Jan 29, 2026
Work consist of re-roof of existing metal roof system, replacement of light transmitting panels.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP for licensed General Contractors to provide labor, material, and equipment for roof replacement and roof coating on the Mebane Hall Building at UNC Charlotte.
Posted Date
Jan 13, 2026
Due Date
Jan 29, 2026
Release: Jan 13, 2026
Close: Jan 29, 2026
RFP for licensed General Contractors to provide labor, material, and equipment for roof replacement and roof coating on the Mebane Hall Building at UNC Charlotte.
AvailableDESIGN-BUILD work includes removal of the existing flat roof system at the wastewater treatment plant office facility and replace it with a new pitched truss roof structure with a metal roofing system.
Posted Date
Dec 12, 2025
Due Date
Feb 10, 2026
Release: Dec 12, 2025
Close: Feb 10, 2026
DESIGN-BUILD work includes removal of the existing flat roof system at the wastewater treatment plant office facility and replace it with a new pitched truss roof structure with a metal roofing system.
AvailableConstruction contract for the removal of existing roof coating and application of new protective coating. Roof of the mechanical building.
Posted Date
Jan 14, 2026
Due Date
Feb 6, 2026
Release: Jan 14, 2026
Close: Feb 6, 2026
Construction contract for the removal of existing roof coating and application of new protective coating. Roof of the mechanical building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →