Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide supervision, labor, materials for Winter Storage 2025/26, Summer Storage 2026 Winter Storage through Spring of 2027. Preparation and painting of USCG Academy Swan 54 Sail Training Vessel. Work is to include the following: 1. Prep, unstep, and store mast and furler; 2. Haul, wash bottom, and block down for dry storage; 3. Install shrink wrap w/door; 4. Winterize main diesel; 5. Winterize heads (2); 6. Winterize holding tank; 7. Winterize air conditioning unit; 8. Winterize refrigerator and freezer; 9. Winterize ice maker; 10. Charge, load test and disconnect batteries; 11. Winterize freshwater systems; 12. Summer Storage 2026; 13. Winter storage 2027; 14. San Prep and paint bottom one coat antifouling prior to Spring 2027 Launch; 15. After launch: prep, step rig, and dockside tune.; 16. Reconnect Batteries.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Full-service water storage tank asset rehabilitation, management, and maintenance program
Posted Date
Oct 17, 2025
Due Date
Jan 27, 2026
Release: Oct 17, 2025
Close: Jan 27, 2026
Full-service water storage tank asset rehabilitation, management, and maintenance program
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
For underground and aboveground storage tank inspection and maintenance.
Posted Date
Oct 23, 2025
Due Date
Jan 16, 2026
Release: Oct 23, 2025
Close: Jan 16, 2026
For underground and aboveground storage tank inspection and maintenance.
AvailableInspection, maintenance and repair of cryogenic storage tanks.
Posted Date
Dec 15, 2025
Due Date
Dec 19, 2026
Release: Dec 15, 2025
Close: Dec 19, 2026
Inspection, maintenance and repair of cryogenic storage tanks.
AvailableTxDOT issued an IFB to procure atmospheric-pressure storage tanks for brine or chemical storage to support the Sealy Maintenance Section. The solicitation requires tanks that meet specified requirements for ambient-temperature, atmospheric storage and instructs respondents to monitor the official posting for addenda and updates. Questions are due by 2025-12-30 and intent to bid is due by 2026-01-09.
Posted Date
Dec 17, 2025
Due Date
Jan 9, 2026
Release: Dec 17, 2025
Close: Jan 9, 2026
TxDOT issued an IFB to procure atmospheric-pressure storage tanks for brine or chemical storage to support the Sealy Maintenance Section. The solicitation requires tanks that meet specified requirements for ambient-temperature, atmospheric storage and instructs respondents to monitor the official posting for addenda and updates. Questions are due by 2025-12-30 and intent to bid is due by 2026-01-09.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →