Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Edgemont Union Free School District is soliciting sealed bids for Greenville Elementary School MPR roof, window replacement, and related work. Bidding documents will be available beginning January 21, 2026 via RevPlans or BidNet Direct. Bids are due February 10, 2026 at 11:00 AM local time, with a non‑mandatory pre‑bid on February 5, 2026 at Greenville Elementary School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Norfolk City Public Schools is soliciting sealed bids to remove and replace windows at Sherwood Forest Elementary School in Norfolk, Virginia. The project includes demolition and installation work at 3035 Sherwood Forest Lane and related site work as specified in the IFB and drawings. Bids are due by 12:00 PM Eastern on February 9, 2026.
Posted Date
-
Due Date
Feb 9, 2026
Close: Feb 9, 2026
Norfolk City Public Schools is soliciting sealed bids to remove and replace windows at Sherwood Forest Elementary School in Norfolk, Virginia. The project includes demolition and installation work at 3035 Sherwood Forest Lane and related site work as specified in the IFB and drawings. Bids are due by 12:00 PM Eastern on February 9, 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Caltrans is soliciting bids to perform window replacement work in Sacramento County. The scope includes removal and replacement of windows and related work per specifications in the solicitation documents. Bids must be submitted through Cal eProcure by the stated deadline.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Caltrans is soliciting bids to perform window replacement work in Sacramento County. The scope includes removal and replacement of windows and related work per specifications in the solicitation documents. Bids must be submitted through Cal eProcure by the stated deadline.
AvailableThe scope of work includes the repair and restoration of existing graveled coal tar built-up roofs (BUR), including flashing renovations as specified and detailed. NO roof replacement is anticipated based on Infra-Red testing. Installation of new sheet metal copings and counter flashings, and all related mechanical, electrical, and plumbing disconnects and re-connects, are included in the Base Bid.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
The scope of work includes the repair and restoration of existing graveled coal tar built-up roofs (BUR), including flashing renovations as specified and detailed. NO roof replacement is anticipated based on Infra-Red testing. Installation of new sheet metal copings and counter flashings, and all related mechanical, electrical, and plumbing disconnects and re-connects, are included in the Base Bid.
AvailableConstruction of the single ply roof replacement. Project consists of approximately 90,368 +/- square feet of roof system removal and replacement with new insulation, new high density cover board, and new fully adhered single ply epdm membrane roofing system with all related flashing and sheet metal work.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Construction of the single ply roof replacement. Project consists of approximately 90,368 +/- square feet of roof system removal and replacement with new insulation, new high density cover board, and new fully adhered single ply epdm membrane roofing system with all related flashing and sheet metal work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →