Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Eau Claire Area School District (ECASD) is soliciting bids for the ECASD Administration Building AHU Replacement to replace air handling unit systems at the district administration building. A non-mandatory pre-bid meeting will be held on January 6, 2026 at 8:30 AM at the ECASD District Administration Building, and plans/specifications will be available for distribution at that meeting. Bid documents (drawings and specifications) are distributed via DemandStar and bidders should contact Jeff Nestor (jnestor@ecasd.us, 715-579-9505) to reserve documents and ask procedural or scope questions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Eau Claire Area School District (ECASD) is soliciting bids for the ECASD Administration Building AHU Replacement to replace air handling unit systems at the district administration building. A non-mandatory pre-bid meeting will be held on January 6, 2026 at 8:30 AM at the ECASD District Administration Building, and plans/specifications will be available for distribution at that meeting. Bid documents (drawings and specifications) are distributed via DemandStar and bidders should contact Jeff Nestor (jnestor@ecasd.us, 715-579-9505) to reserve documents and ask procedural or scope questions.
Posted Date
Dec 16, 2025
Due Date
Jan 14, 2026
Release: Dec 16, 2025
Close: Jan 14, 2026
The Eau Claire Area School District (ECASD) is soliciting bids for the ECASD Administration Building AHU Replacement to replace air handling unit systems at the district administration building. A non-mandatory pre-bid meeting will be held on January 6, 2026 at 8:30 AM at the ECASD District Administration Building, and plans/specifications will be available for distribution at that meeting. Bid documents (drawings and specifications) are distributed via DemandStar and bidders should contact Jeff Nestor (jnestor@ecasd.us, 715-579-9505) to reserve documents and ask procedural or scope questions.
AvailableThe project consists of the replacement of AHU-1B at the UAB Highlands facility. The scope of work includes mechanical demolition and new work, as well as associated architectural and electrical modifications as required to facilitate the equipment replacement.
Posted Date
Dec 3, 2025
Due Date
Jan 29, 2026
Release: Dec 3, 2025
Close: Jan 29, 2026
The project consists of the replacement of AHU-1B at the UAB Highlands facility. The scope of work includes mechanical demolition and new work, as well as associated architectural and electrical modifications as required to facilitate the equipment replacement.
AvailableThe St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
The St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
The St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
The St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis