Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
The St. Johns River Water Management District is soliciting bids (Invitation to Bid ITB-14621) for the complete replacement of the administration building roof and gutter system at its District Headquarters in Palatka, Florida. The scope includes removal and disposal of existing metal roofing, installation of a new standing-seam Galvalume roof system with new insulation, new aluminum box gutters and downspouts, a new lightning protection system, and replacement of one aluminum window assembly. Substantial completion is required within 90 calendar days, with final completion by August 14, 2026. Responses are due by January 20, 2026.
AvailableProcurement of services for the replacement of approximately 18,500 square feet of EPDM roof with a new 60 mil PVC watertight roof system and building envelope masonry repairs.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Procurement of services for the replacement of approximately 18,500 square feet of EPDM roof with a new 60 mil PVC watertight roof system and building envelope masonry repairs.
AvailableSewage treatment plant roof replacement at generator building. Project will include the removal and replacement of the General Building upper and lower roofs at the Butterworth STP including the replacement of the tectum deck with steel deck.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Sewage treatment plant roof replacement at generator building. Project will include the removal and replacement of the General Building upper and lower roofs at the Butterworth STP including the replacement of the tectum deck with steel deck.
AvailableSeeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
Posted Date
Dec 7, 2025
Due Date
Dec 29, 2025
Release: Dec 7, 2025
Close: Dec 29, 2025
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis