CountyCA
Posted
Nov 13, 2026
Dec 16, 2026
Eastlake Sanitary Landfill Phase 2 \& 3 Cell Construction RFP
Project Description (Scope of Work): Contractor shall furnish all labor, materials, tools, equipment, supervision, transportation, and installation services required for the following tasks, at a minimum, the project includes including excavating and stockpiling of soils and rock, geosynthetics installation, construction of the leachate collection and removal system (LCRS) gravel and piping, construction of the underdrain system, stormwater components, relocation of the existing sump pump and controls, extension of the electric and force main to the new sump location, and relocation of existing stormwater and landfill gas pipes.