Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Invitation for Bids (IFB) titled "Eastern Service Area Gravity Sewer Lining Project A" with ID IFB-720-WUD 24-035R-1 posted on Dec. 16, 2025. The solicitation requests bids for gravity sewer lining work in the Eastern Service Area of Palm Beach County, with an estimated value range of $1,000,000‑$5,000,000. The response deadline is Jan. 28, 2026 and the official source is the Palm Beach County Vendor Self‑Service Advantage4 portal, which requires authentication for document access.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Work includes rehabilitation of the gravity sewer collection system in lift station basins 166, 180, 246, 247, 264, 267, 305, 380, and 1045 consisting generally of, but not limited to, installation of cured-in-place pipe (cipp) in 39,000 linear feet of gravity sewer mains, installation of cipp in 61 1 sewer laterals, point repairs on sewer mains, sewer lateral replacement, rehabilitation of 26 manholes, manhole replacement or installation, replacement of gravity sewer mains, and site restoration and cleanup.
Posted Date
Aug 17, 2025
Due Date
Jan 28, 2026
Release: Aug 17, 2025
Close: Jan 28, 2026
Work includes rehabilitation of the gravity sewer collection system in lift station basins 166, 180, 246, 247, 264, 267, 305, 380, and 1045 consisting generally of, but not limited to, installation of cured-in-place pipe (cipp) in 39,000 linear feet of gravity sewer mains, installation of cipp in 61 1 sewer laterals, point repairs on sewer mains, sewer lateral replacement, rehabilitation of 26 manholes, manhole replacement or installation, replacement of gravity sewer mains, and site restoration and cleanup.
AvailableThe City of Woodland is soliciting contractors to perform cured-in-place pipe (CIPP) lining of ninety-five (95) 4-inch sanitary sewer laterals as part of the FY 2025/26 Sewer Lateral Lining Project to improve the sanitary sewer system. The work requires appropriate California contractor licensing, Department of Industrial Relations registration, and completion within forty (40) days from Notice to Proceed.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
The City of Woodland is soliciting contractors to perform cured-in-place pipe (CIPP) lining of ninety-five (95) 4-inch sanitary sewer laterals as part of the FY 2025/26 Sewer Lateral Lining Project to improve the sanitary sewer system. The work requires appropriate California contractor licensing, Department of Industrial Relations registration, and completion within forty (40) days from Notice to Proceed.
The City of Woodland is soliciting contractors to perform cured-in-place pipe (CIPP) lining of ninety-five (95) 4-inch sanitary sewer laterals as part of the FY 2025/26 Sewer Lateral Lining Project to improve the sanitary sewer system. The work requires appropriate California contractor licensing, Department of Industrial Relations registration, and completion within forty (40) days from Notice to Proceed.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
The City of Woodland is soliciting contractors to perform cured-in-place pipe (CIPP) lining of ninety-five (95) 4-inch sanitary sewer laterals as part of the FY 2025/26 Sewer Lateral Lining Project to improve the sanitary sewer system. The work requires appropriate California contractor licensing, Department of Industrial Relations registration, and completion within forty (40) days from Notice to Proceed.
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.