Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Improvements for East Wyatt Road including pavement preparation, asphalt overlay, concrete work, storm sewer improvements, street lighting, pavement striping, and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Approx. 3400 feet paving project. Scratch coat and wearing course to obtain a 2% wearing course. Driveways need to be repaired to a maximum of ten feet for propert grade. Mill all end joints and driveways. Manhole risers adjusted or added where needed.
Posted Date
Jan 21, 2026
Due Date
Mar 2, 2026
Release: Jan 21, 2026
Close: Mar 2, 2026
Approx. 3400 feet paving project. Scratch coat and wearing course to obtain a 2% wearing course. Driveways need to be repaired to a maximum of ten feet for propert grade. Mill all end joints and driveways. Manhole risers adjusted or added where needed.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Saratoga Springs, Utah is soliciting bids for its 2026 Pavement Maintenance Project, which consists of road maintenance work throughout the city. The opportunity opened on January 22, 2026 and closes on February 10, 2026, with project plans to be made available on January 29, 2026. Bids are to be submitted via the U3P/Bonfire procurement portal and the solicitation is categorized as an RFB (not a grant).
Posted Date
Jan 22, 2026
Due Date
Feb 10, 2026
Release: Jan 22, 2026
Close: Feb 10, 2026
The City of Saratoga Springs, Utah is soliciting bids for its 2026 Pavement Maintenance Project, which consists of road maintenance work throughout the city. The opportunity opened on January 22, 2026 and closes on February 10, 2026, with project plans to be made available on January 29, 2026. Bids are to be submitted via the U3P/Bonfire procurement portal and the solicitation is categorized as an RFB (not a grant).
AvailableThis RFP is for design and engineering services to widen the existing Pony Express Parkway and design a new bridge over the Jordan River in Saratoga Springs.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
This RFP is for design and engineering services to widen the existing Pony Express Parkway and design a new bridge over the Jordan River in Saratoga Springs.
AvailableEast Carolina University (issued through the UNC System Office Design/Construction) is soliciting architectural/engineering services to replace the existing 24-year-old modified bitumen roof on Joyner East with a new single-ply PVC roofing system and to replace drain bowls and drain lines. The solicitation is open and responses are due February 5, 2026, with work expected to be completed by February 5, 2026. Proposers must be licensed to offer architectural or engineering services in North Carolina; procurement ID 287-30697-DS and an agency estimate of approximately $570,000 are provided.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
East Carolina University (issued through the UNC System Office Design/Construction) is soliciting architectural/engineering services to replace the existing 24-year-old modified bitumen roof on Joyner East with a new single-ply PVC roofing system and to replace drain bowls and drain lines. The solicitation is open and responses are due February 5, 2026, with work expected to be completed by February 5, 2026. Proposers must be licensed to offer architectural or engineering services in North Carolina; procurement ID 287-30697-DS and an agency estimate of approximately $570,000 are provided.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →