Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx. 10 LF of open cut point repair of 6" gravity sanitary sewer at one location; 20 LF of 6" PVC building connections at one location; 10,452 LF of cured-in-place pipe; grouting 121 service connections in cure-in-place pipe, exterior grouting and interior sealing of 390 vertical feet of sewer manholes; grouting and patching 13 sewer manholes; installation of three manhole inflow dishes; building of seven manhole bench and inverts; replacement of one manhole frame and cover. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
AvailableThe project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
The project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
AvailableThe Beaufort - Jasper Water & Sewer Authority is soliciting bids for CIP-2483 to provide and install new 8", 16" and 18" sanitary forcemain and related appurtenances (approx. 1100', 2900' and 5400'). Installation methods include horizontal directional drill, jack and bore, and direct bury. Documents are available from the Authority's procurement portal (Bonfire) and bids are due January 15, 2026 at 2:00 PM.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
The Beaufort - Jasper Water & Sewer Authority is soliciting bids for CIP-2483 to provide and install new 8", 16" and 18" sanitary forcemain and related appurtenances (approx. 1100', 2900' and 5400'). Installation methods include horizontal directional drill, jack and bore, and direct bury. Documents are available from the Authority's procurement portal (Bonfire) and bids are due January 15, 2026 at 2:00 PM.
Campus, downtown, and ave sanitary sewer study.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Campus, downtown, and ave sanitary sewer study.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →