Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Velasco Drainage District seeks bids for the expansion of the East Levee Pump Station in Brazoria County, Texas. The project involves installing owner-furnished pumps, right angle gears, diesel engines, catenary trash rakes, and modifications to mechanical, electrical, and piping systems. A mandatory pre-bid meeting is scheduled, and a bid security of 5% is required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump station phase III, equipment addition, 96" discharge pipe. The work generally consists of installation of steel sheet pile shoring system.
Posted Date
Dec 25, 2025
Due Date
Jan 19, 2026
Release: Dec 25, 2025
Close: Jan 19, 2026
Pump station phase III, equipment addition, 96" discharge pipe. The work generally consists of installation of steel sheet pile shoring system.
Available30" Ductile Iron Pipe 48 LF, 3" Ductile Iron Pipe 3 LF, 24" x 18" Reducer 2 EA, 18" Spring Check Valve 2 EA, Service (Wye) Connection, 30" x 24" 2 EA, 30" 90° Bend 2 EA, 18" 11.25 degree Bend 1 EA, 30" Blind Flange 1 EA, Connection to Existing Structure 1 EA, Demolition of Existing Pipes 1 LS.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
30" Ductile Iron Pipe 48 LF, 3" Ductile Iron Pipe 3 LF, 24" x 18" Reducer 2 EA, 18" Spring Check Valve 2 EA, Service (Wye) Connection, 30" x 24" 2 EA, 30" 90° Bend 2 EA, 18" 11.25 degree Bend 1 EA, 30" Blind Flange 1 EA, Connection to Existing Structure 1 EA, Demolition of Existing Pipes 1 LS.
AvailableProvide Influent Pump Station Expansion Project CM/GC. Construction Manager / General Contractor (“CM/GC”) delivery method to integrate design and construction planning, improve risk management, and maintain operational continuity during construction. The CM/GC will first perform pre-construction services, then, upon agreement of a Guaranteed Maximum Price (“GMP”), may proceed to construction under a contract amendment.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Close: Jan 29, 2026
Provide Influent Pump Station Expansion Project CM/GC. Construction Manager / General Contractor (“CM/GC”) delivery method to integrate design and construction planning, improve risk management, and maintain operational continuity during construction. The CM/GC will first perform pre-construction services, then, upon agreement of a Guaranteed Maximum Price (“GMP”), may proceed to construction under a contract amendment.
Procurement of one submersible pump for the Steeplechase Pump Station.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Release: Dec 11, 2025
Close: Jan 12, 2026
Procurement of one submersible pump for the Steeplechase Pump Station.